Dhaka Shanghai International

Simple

Solar panel

>>•High efficiency solar panels with high transmission solar cells

Simple

13.5Tons crawler excavator

>>Operating Weight:7000Kg

>>Engine Power:63horsepower

Simple

JHL70 type 180-Degree Excavator

>>Operating Weight:4,800Kg

>>Engine Power:60horsepower

Ready to Start your contract with DSI

!

Get Started!

DSI is providing extra service and help the clients for more than one year. And it’s also help clients by giving expert workers and technicians to operate the production line if clients ask for help. DSI have its own technicians beside Chinese engineer and technicians.

 

TK & HHK Manufacturing Plant Consultancy

DSI is pioneer to provide consultation for TK (Tunnel Kiln) & HHK (Hybrid Hoffman Kiln) Auto-Bricks manufacturing plant in Bangladesh. We have the best professionals and experts to design, supervise, install and commissioning of an efficient TK & HHK plant. We are also offering an exclusive corporate proposal at a reasonable cost for implementing the Auto-Brick Manufacturing Plant. Our consulting team is skilled in supervision and directing the internal company support work to ensure that budget and schedule constraints are met.

Our scope of services to implement an efficient TK & HHK Auto-Bricks manufacturing plant:

 

Design & Supervision under QC

Machinery Supply

Trial Production

Train up Manpower

Feed Back after Sales

 

§ Please scroll down  to see our Scope of Service in details.

 

 

Technical Collaboration:

 

DSI is in the process of arranging technical collaboration with Chinese Brick manufacturing companies, experts and research institutes and organizations with a vision to become the Brick Technology Pioneer in Bangladesh.

 

Our Consultancy Team:  


Our TK & HHK plant consultancy TEAM consists of Local & Foreign Experts which are split into:

Project Design Team 

Project Implementation Team  

Project Support Team

Project Documentation Team

Skilled Worker Team:

DSI has more than 70 (seventy) of expert Mason for the construction work including 10 (ten) mason who are specialized in Kiln construction work.

 

Our Scope of Service

 

A.    Design & Supervision:

DSI will complete site specific lay outs for the project;

Develop the overall plant designs and select appropriate machineries for the proposed project;

Supervise the construction of civil works of main plant which includes kiln, dryer, machine foundation and other related facilities / infrastructure by providing required engineers and designer team to supervise design level construction.


B.     Machinery Supply:

DSI will select and finalize the appropriate machinery for the plant;

Imported portion of machinery will be supplied by the authorized supplier of DSI after opening of L/C by the client in due time as agreed with DSI, preferably, within 35 days of commissioning of the construction work. It will need at least 3 months for the machinery to come to the project site after opening L/C.

Regarding local machinery, DSI will provide the required specification while the client will source and procure these by themselves.

 

C.    Trial Production:

Upon completion of construction, installation of plant and machinery, DSI will design suitable program / schedule for plant start up and trial run in consultation with client.

DSI will provide the list and amount of materials and workers / operators required for trial production and the client will accordingly arrange everything necessary to start up the trial production.


D.    Training of Manpower:

DSI will arrange for the training of key personnel for plant operation during trial run.

The training includes the following persons:

Operators (List will be provided)

Dry brick set up (1 supervisor along with 5 workers)

Technicians for small maintenance

Workers group to be engaged in green brick set up on the trolley (1 supervisor along with 5 workers)

Workers group to be engaged in finished brick staking (1 supervisor along with 5 workers)

 E.     Duration of Service:

Normally 6 to 8 months (construction and trail production period) after opening L/C.

F.     After sales service:

DSI shall provide feedback and trouble-shooting services but not for more than 12 months after commissioning. However, after 12 months, a separate service agreement may be concluded between DSI and the client, if the client has the intention to do so.